Robot Arm™ ESD 3

1/5

Pre-start Inspection

NOTE: If your machine has not been setup yet, please follow the setup instruction received with the purchase of your RG600PRO.

It is important to check your machine before starting operation before every shift.

Air

Check compressed air supply connected to machine. 

Check the valve is open and the regulator set to 7.5 - 8 bar (0.75 - 0.8 MPa)(110 - 116 Psi)

Drain moisture from pressure regulator

 

Electrical

Visually inspect all cables and connections, making sure there is no damage.

Ensure 220 - 240V connected to machine

Make sure PowerVent cable is connected

Make sure the emergency stop button is deactivated

 

Water

Check water level in supply tank

Check water level in tray underneath the machine

Check hoses for any leaks

 

General

Make sure there are no obstructions or dangerous tools or equipment in or around the machine.

Do I have all the appropriate personal protective equipment (PPE)

Make sure the moving arm is in down position.